@RISK used by National Grid UK in Electricity Network Restoration Planning

National Grid UK, the electricity transmission system owner for England and Wales and the system operator for all of Great Britain, uses @RISK’s probabilistic modeling techniques to measure network restoration performance in a variety of simulated failure scenarios. In other words, if the system, or part of it, somehow breaks down, the people at the […]

@RISK for Cost and Schedule Risk Using Risk Registers (with Example Model)

@RISK can be used in conjunction with MS Project and Excel to model the schedule and cost risks inherent in large, complex projects. This example demonstrates the use of @RISK to build a complete model of the construction of a new commercial venue. The model includes uncertainty in task times, a Risk Register for calculating […]