Allocating Contingencies to Uncertain Cost Elements in a Cost Risk Analysis Model

In a previous entry to this blog I discussed how to assess the contingency required in a cost risk analysis study. The next step is to allocate the calculated contingency to uncertain cost elements that drive the variation in the total cost of the project. In this way, the contingency can be better managed and […]